27 lines
1.2 KiB
Plaintext
27 lines
1.2 KiB
Plaintext
=============================================================================
|
||
|
||
AST RESEARCH, INC. TECHNICAL BULLETIN #0499A 05/16/90
|
||
|
||
=============================================================================
|
||
|
||
|
||
AST-5250 ASYNC DIAL-UP FUNCTIONAL ISSUES
|
||
|
||
|
||
AST Data Comm Product Marketing has reviewed all aspects of the following
|
||
functional issues relating to the 5250 Async Dial-up product (part number
|
||
500307-001). They have made the determination that these issues will not be
|
||
resolved for this product.
|
||
|
||
These issues are as follows:
|
||
|
||
- The user is sharing one session between the master and slave systems.
|
||
This device is also used as a sub-console. When a change is made to
|
||
the screen of the slave, such as a change of menu, the screen takes
|
||
about 30 seconds to completely refresh on the slave. (PR#A46011)
|
||
|
||
- A job sent from the IBM System/36 to a printer attached to an Async
|
||
Dial-up slave may appear to operate very slowly. The printer will
|
||
print two lines, pause, then print two more lines. The Async Dial-up
|
||
product is however, operating as designed. (PR#A46015)
|
||
|