249 lines
11 KiB
Plaintext
249 lines
11 KiB
Plaintext
![]() |
|
|||
|
SSWC - Bell Research Report (Vol II)
|
|||
|
|
|||
|
All research gathered, tested and mastered by the original
|
|||
|
members of SSWC:
|
|||
|
|
|||
|
Chance - The Technician - Cellular Phantom
|
|||
|
|
|||
|
|
|||
|
SSWC presents our latest text file continuing our discussion
|
|||
|
on Bell Operating Departments. Note that information in
|
|||
|
this file is subject to change. However, we will try to keep
|
|||
|
you updated as much as possible.
|
|||
|
|
|||
|
|
|||
|
We will begin by discussing an important department of Bell,
|
|||
|
known as the Maintenance Center (MC) or Special Service Center
|
|||
|
(SSC). The MC is responsible for verifying and coordinating the
|
|||
|
transfer of special service activities between the Construction
|
|||
|
Work Group (CWG) and the Central Office Work Group (COWG). The MC
|
|||
|
or SSC will maintain control of all special service transfers.
|
|||
|
|
|||
|
Note: When using an approved transfer switch, testing of
|
|||
|
Plain Old Telephone Service (POTS) services will be
|
|||
|
performed by the CWG. The MC need only test services
|
|||
|
classified as type "B". (This type of classification
|
|||
|
is generally used on the Computer System for Mainframe
|
|||
|
Operation (COSMOS) mainframe).
|
|||
|
|
|||
|
The MC will receive a copy of the cable transfer and associated
|
|||
|
work orders from the Loop Assignment Center (LAC) prior to the
|
|||
|
scheduled start date of the transfer. They will deal with any
|
|||
|
unrecognized problems (such as clearing defective pairs, if
|
|||
|
requested by the Distribution Service Design Center (DSDC), and
|
|||
|
giving notification of what pairs have been or cannot be cleared)
|
|||
|
that would require new pair count assignments.
|
|||
|
|
|||
|
The MC shall arrange with the CWG, Frame Control Center (FCC),
|
|||
|
SSC, and other necessary departments for the transfer of special
|
|||
|
and designed services that require release or special handling.
|
|||
|
During the transfer of these services, the MC will maintain
|
|||
|
communication with all personnel involved in the transfer
|
|||
|
activity.
|
|||
|
|
|||
|
The MC or SSC shall coordinate the release and transfer of
|
|||
|
special and designed services designated as "B" services. The time
|
|||
|
and date for each service release shall be recorded on the MC copy
|
|||
|
of the Special Service Protection List and Defective Pair List.
|
|||
|
|
|||
|
Note: Time and date of release must be negotiated in advance
|
|||
|
of the cable transfer. No work shall be permitted on
|
|||
|
service requiring a release until a method of procedure,
|
|||
|
including release date and time and personnel required,
|
|||
|
has been established by the MC and approved by the
|
|||
|
|
|||
|
customer and SSC control office responsible for those
|
|||
|
services. When the MC receives work of those specific
|
|||
|
or out-of-the-ordinary release requirements, the
|
|||
|
Construction Management Center (CMC) supervisor, FCC
|
|||
|
supervisor, and other necessary work group supervisors
|
|||
|
must be notified in advance so they can begin work on
|
|||
|
the transfer.
|
|||
|
|
|||
|
The MC shall test all affected special and designed services
|
|||
|
completed by the CWG as the transfer progresses. The CWG need not
|
|||
|
wait for verification by the MC, unless problems are encountered.
|
|||
|
The CWG will inform the MC of progress. The MC shall have the
|
|||
|
authority to stop the transfer procedures at any time if extensive
|
|||
|
trouble reports develope. If this occurs, the MC supervisor will
|
|||
|
lead an investigating committee to determine the cause of trouble
|
|||
|
and to recommend corrective action.
|
|||
|
|
|||
|
After all work is completed, the MC will issue a final closing
|
|||
|
number for the completed transfer. The MC will notify the FCC that
|
|||
|
the transfer is complete and will give them the closing number.
|
|||
|
The MC will post the Cable Transfer Form as complete and will
|
|||
|
forward the transfer, including changes, and Defective Pair List
|
|||
|
to the LAC.
|
|||
|
|
|||
|
|
|||
|
We will now discuss the uses of the Cable Transfer Administration
|
|||
|
(CTA), and how they operate at a successful level.
|
|||
|
|
|||
|
The general functions and responsibilities of the CTA work group
|
|||
|
is to provide flexibility in the design of the cable network,
|
|||
|
existing cable pairs are transferred for one cable count to another
|
|||
|
cable count. This is commonly referred to as a cable transfer or
|
|||
|
cable throw. The transfer occurs in a splice and involves
|
|||
|
disconnecting pairs of wires beyond the splice from one feeder
|
|||
|
cable count and reconnecting then to a different feeder count.
|
|||
|
The result is that the count of the pairs beyond the splice will
|
|||
|
change. The configuration, identification, and possible transferring
|
|||
|
of working cable pairs are complex and time-consuming. The work
|
|||
|
is further complicated by the many functions required of other
|
|||
|
work groups. To ensure that these operations are performed free of
|
|||
|
service interruptions and with maximum efficiency, timing and close
|
|||
|
coordination among all the work groups involved are mandatory.
|
|||
|
|
|||
|
The same coordination is required to complete drop wire re-
|
|||
|
connections (line transfers). The Cable Transfer Committee (CTC)
|
|||
|
is also responsible for organizing this work in a timely manner.
|
|||
|
As soon as practical, after the line transfer have been completed,
|
|||
|
the old cable should be cut off and removed. (Their is more
|
|||
|
hardware work involved in this process, however we regret that
|
|||
|
we have not yet been able to fully research and understand what
|
|||
|
further hardware applications are used).
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
In order for the Cable Transfer Committee to obtain a high
|
|||
|
degree of transfer efficiency, all committee members must attend
|
|||
|
committee meetings on a selective basis and monitor the published
|
|||
|
minutes (in other words review information from past meetings).
|
|||
|
Higher management will be able to evaluate the effectiveness of
|
|||
|
the transfer committee. The number of jobs completed as scheduled
|
|||
|
and the ability of the committee to identify problems should be
|
|||
|
monitored as a measure of committee success in scheduling and
|
|||
|
completing cable transfers.
|
|||
|
|
|||
|
The use of these procedures will reduce customer trouble reports
|
|||
|
and the overall cost of cable and line transfers and will permit
|
|||
|
balancing the work force and work load for all groups involved.
|
|||
|
By completing cable transfers promptly, in accordance with the
|
|||
|
time schedule, changes to transfer sheets will be minimized, the
|
|||
|
need for rerunning cables will be reduced, testing cables can be
|
|||
|
properly scheduled, and time spent on field work can be shortened.
|
|||
|
The errors, frustrations, and probability of cable troubles
|
|||
|
associated with delays in this kind of work can be virtually
|
|||
|
eliminated.
|
|||
|
|
|||
|
A Cable Transfer Committee must be established in each network
|
|||
|
distribution service/construction district to ensure close
|
|||
|
coordination and proper timing of cable, line, or station transfers.
|
|||
|
Districts that cover a large service area (having more that one
|
|||
|
Loop Assignment Center or Maintenance Center) may require more
|
|||
|
than one committee.
|
|||
|
|
|||
|
|
|||
|
When scheduling transfers, consideration must be given to work
|
|||
|
tours and peak load periods (busy times of the week) of all work
|
|||
|
groups to optimize the continuity of the cable transfer activity.
|
|||
|
Consideration must also be given to time required by the CWG
|
|||
|
to complete preliminary work, by the LAC to analyze and lay out
|
|||
|
the transfer, by the Circuit Provision Center (CPC) to check the
|
|||
|
design of special services, by DSDC, Construction Management
|
|||
|
Center (CMC), and installation to make the resulting changes, and
|
|||
|
by the MC and/or SSC to negotiate with special service customers.
|
|||
|
The Cable Transfer Committee must negotiate all completion dates.
|
|||
|
The transfer committee chairperson will monitor and take action
|
|||
|
on excessive time intervals for all work groups. Transfers that
|
|||
|
involve an extremely large number of working circuits may require
|
|||
|
scheduling in smaller segments. Transfers should be scheduled to
|
|||
|
maintain continuity until wire work is completed. The committee
|
|||
|
is responsible for all special scheduling. Offices with
|
|||
|
mechanized assignment records such as COSMOS or TIRKS require
|
|||
|
more strict scheduling due to transaction restrictions.
|
|||
|
Sequence transfers and the reusing of counts cleared on previous
|
|||
|
transfers may also require more strict scheduling. Cable
|
|||
|
transfers worked via COSMOS must be closely monitored to avoid
|
|||
|
long-term storage of cable transfers in the data base.
|
|||
|
Long-term storage causes changes for the FCC and CWG, thereby
|
|||
|
|
|||
|
causing lost time. The committee will make preliminary arrange-
|
|||
|
ments for the transfer of special and designed services. The LAC
|
|||
|
will provide a list of all special services, by Common Language
|
|||
|
Circuit Identification (CLCI), that are in the affected cable
|
|||
|
count to the DSDC prior to scheduling the transfer in the firm
|
|||
|
period. The DSDC will forward the list to the CPC along with the
|
|||
|
new and old cable makeup for the reissuance of new Work Order
|
|||
|
Record Detail (WORD - The work authorization and layout card
|
|||
|
for designed special services) documents and redesigns, if
|
|||
|
necessary.
|
|||
|
|
|||
|
After the new WORD documents are received, the FCC will bring
|
|||
|
the Work Authorization (WA - The first page of the WORD document)
|
|||
|
to the CTA committee meetings. The WA copy will contain the work
|
|||
|
description and associated notes for the transfer and, most
|
|||
|
important, will give the circuit classification code "A" or "B".
|
|||
|
|
|||
|
|
|||
|
|
|||
|
Next we will discuss information concerning the Telephone
|
|||
|
Outside Plant. This brief discussion will inform you exactly what
|
|||
|
path cables take from the CO to the subscribers residence.
|
|||
|
This path is as follows:
|
|||
|
|
|||
|
|
|||
|
1 Main Distributing Frame (MDF)
|
|||
|
2 Tip Cables
|
|||
|
3 Cable Vault
|
|||
|
4 CO Manhole
|
|||
|
5 Main Conduit
|
|||
|
6 Subsidiary Conduit
|
|||
|
7 Insulated Joint
|
|||
|
8 Main Distributing Terminal (MDT)
|
|||
|
9 Riser Cable
|
|||
|
10 Distributing Terminal
|
|||
|
11 Anchor Guy
|
|||
|
12 Aerial Cable Cross Connecting Box
|
|||
|
13 Telephone Company Owned Pole
|
|||
|
14 Aerial Cable
|
|||
|
15 Strand (one cable)
|
|||
|
16 Joint Use Pole Electric or Telephone
|
|||
|
17 Terminal
|
|||
|
18 Splice
|
|||
|
19 Electric Wires
|
|||
|
20 Urban Wires
|
|||
|
21 Dropwire
|
|||
|
22 Main U.G. Cable
|
|||
|
23 Stub
|
|||
|
24 Rear Wall Cable
|
|||
|
25 Buried Cable
|
|||
|
26 Cribbing
|
|||
|
27 Block Pole
|
|||
|
|
|||
|
|
|||
|
After completing this sequence the cables will then run into
|
|||
|
the residence, providing telephone service.
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
* Note to the reader: In order to gain maximum knowledge
|
|||
|
from this file, it is suggested that you obtain and
|
|||
|
study our first file.
|
|||
|
|
|||
|
This concludes SSWCs Bell Research Report (Vol II).
|
|||
|
The information contained in this file is solely for the
|
|||
|
use of Phone Phreaks that FULLY understand what has been
|
|||
|
discussed. If you do not FULLY understand what has been
|
|||
|
discussed in this file, it is extremely advisable not to
|
|||
|
attempt to use any of this information, whereas you
|
|||
|
could cause an extreme negative impact on the rest of the
|
|||
|
Phreak community. Have a good time, learn what you can,
|
|||
|
but never think you know more than you do. To the
|
|||
|
novice this file is all technical BullShit. However, to
|
|||
|
the experienced Phreak, its much, much more.
|
|||
|
|
|||
|
|
|||
|
* SSWC: The leader in innovative phreaking!
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|
|||
|
|